Ensure that the output of the sand production line starts from the installation
Time:2019-08-20 Back to list
If you are looking for related products or have any other questions, please feel free to call our sales hotline or click the right button to ask for a quote online!
To ensure the production efficiency of the sand production line, we must start from the installation. If the sand making machine is improperly installed in the sand production line, it will affect the output of the entire production line, so how to install correctly and how to install it can be more efficient. The role of the sand making machine in the gravel line is the * concerned issue for many sand and stone manufacturers.
Depending on the location of the crushing site, the installation location of the sand production line will vary, typically in a factory or in an open field. Before the stone crushing equipment is installed:
1. First, check the packing list according to the packing list to check whether the various parts are worn or not during transportation.
2. When installing, the new sand making machine should be leveled so that its main axis is perpendicular to the horizontal plane. Appropriate space should be left on both sides and sides of the new sand making machine for hoisting and maintenance;
3. After the installation is completed, a full inspection should still be carried out, for example: whether the lubricating oil pipe is firmly connected;
4. The sand production line equipment must be re-added once before the test run, and check whether the connection between the parts is firm and reliable, whether there is any foreign matter on the impeller, and whether the motor wiring is correct;
5. After the operation, if there is any abnormality, the operation should be s*ped immediately. This installation method can *ly improve the production efficiency of the sand making machine in the sand production line.
1. First, check the packing list according to the packing list to check whether the various parts are worn or not during transportation.
2. When installing, the new sand making machine should be leveled so that its main axis is perpendicular to the horizontal plane. Appropriate space should be left on both sides and sides of the new sand making machine for hoisting and maintenance;
3. After the installation is completed, a full inspection should still be carried out, for example: whether the lubricating oil pipe is firmly connected;
4. The sand production line equipment must be re-added once before the test run, and check whether the connection between the parts is firm and reliable, whether there is any foreign matter on the impeller, and whether the motor wiring is correct;
5. After the operation, if there is any abnormality, the operation should be s*ped immediately. This installation method can *ly improve the production efficiency of the sand making machine in the sand production line.
Related News
- There is no need to rush to increase the production capacity of cone crushers. Here are the methods
- 9 ways to help you solve the problems of blocking, spilling and non-feeding of vibrating feeders
- How to use jaw crusher well in the first stage of material crushing?
- Important factors causing unsatisfactory operation of sand making machine
- How to view the amplitude of the vibrating screen?
- Characteristics and application of jaw crusher
Leave message
Product Center
- Cone Crusher Machine
- • PXH series gyratory crusher
- • Single cylinder cone crusher
- • Spring Cone Crusher
- • Compound Cone Crusher
- • PSG Series Compound Cone Crusher
- Stone Crushing Machine
- • Sand Making Machine
- • Jaw Crusher
- • Vertical Shaft Impact Crusher
- • Impact Crusher
- Screening Sand Washing
- • XS Sand washing machine
- • circular Vibrating Screen
- • ZSW Series Vibrating Feeder
- Mobile Crusher Plant
- • PC Series Mobile Cone Crusher Plants
- • PC Series Mobile Jaw Crusher Plants
- • PC Series Mobile Impact Crusher Plants
- • PC Series Mobile VSI Crushing Plants
Materials
- • River Stone Crushing Processing
- • Iron Ore Crushing Processing
- • Aggregate Crushing Processing
- • Granite Crushing Processing
- • Basalt Crushing Processing
- • Gold Ore Crushing Processing
Contact Us
Add:Room 609,Easttower,xiyuan international square,Jianshe Road,Zhengzhou City,Henan Province,China
Tel:+86-371-67660555
Whatsapp:+0086-13676922906
Email:sales@zxcrusher.com
Web:www.zxstonecrusher.com