When the load around the moving cone liner of the cone crusher is even, and all aspects of * are optimized and in a better state, it can *ly reduce production costs, improve production efficiency, and bring *er benefits to the enterprise. Jiaozuo Zhongxin reminds you: Doing the following 9 points can reduce the wear of the cone crushing cone.
1, Strictly control the feeding.
Clarify the requirements of the cone crusher for crushed materials, and prohibit materials that do not meet the crushing requirements of the equipment from entering the equipment.
2, Install the moving cone correctly.
In the installation process of the moving cone, attention should be paid to the dustproof of the working surface such as the eccentric bushing, spherical tile, tapered bushing, and straight bushing of the frame. After installation, use soft lead to measure the clearance and contact area of each mating surface to make it meet the requirements. 3, Reduce the looseness of the moving cone.
By removing the s* gear, and adding a cutting melting ring between the cone head and the pressure sleeve, when the cone crusher is running under load, the rotation of the distribution plate and the cone head can be used to automatically tighten, reducing the looseness of the moving cone. Wear.
4, Reduce the impact of bulk materials.
Materials with too large lumps should be prohibited from entering the cone crusher. If necessary, large lumps of materials can be blasted and then sent into the crushing cavity to reduce the impact and abrasion of the large materials on the moving cone.
5, Improve the force condition of the moving cone.
By installing a hydraulic device under the base of the cone crusher, the dead weight of the moving cone and the vertical component of the ore crushing are borne by the hydraulic cylinder to improve the force of the moving cone and make its operation stable and reliable, to a certain extent Reduce the damage of the moving cone.
6, Pay attention to the inspection during production. Once the cone crusher has an abnormality, all operators must s* the machine in time and conduct a * inspection. If the spherical bearing of the cone crusher is damaged, it needs to be repaired or replaced in time, and the clearance of the cone bushing of the cone crusher should be repaired or replaced in time. Make adjustments to ensure that there is enough space.
7, Reliable safety device.
Nowadays, hydraulic safety devices are generally used. When the equipment is overloaded or overloaded, the hydraulic safety devices can take effect immediately, reducing the damage to the moving cone caused by the overload of the cone crusher.
8, Prevent the imbalance of the moving cone.
The imbalance of the moving cone will cause serious accidents in the cone crusher, and even breakage, breakage of the main shaft, cracking of the cone bushing and other failures. Therefore, in the production, attention should be paid to prevent the unbalance of the moving cone. When the moving cone is found to be out of balance, the cause should be found out and eliminated in time to extend the service life of the moving cone and its equipment components.
9, Good lubrication.
Before the cone crusher starts to work, check the lubrication status of the moving cone and check whether there are impurities in the lubricating oil. During the operation of the moving cone, pay attention to the temperature of the lubricating oil and ensure that the oil circuit is clear. When the lubricating oil deteriorates, it is necessary to filter or replace the clean lubricating oil in time to ensure good lubrication of the moving cone.
1, Strictly control the feeding.
Clarify the requirements of the cone crusher for crushed materials, and prohibit materials that do not meet the crushing requirements of the equipment from entering the equipment.
2, Install the moving cone correctly.
In the installation process of the moving cone, attention should be paid to the dustproof of the working surface such as the eccentric bushing, spherical tile, tapered bushing, and straight bushing of the frame. After installation, use soft lead to measure the clearance and contact area of each mating surface to make it meet the requirements. 3, Reduce the looseness of the moving cone.
By removing the s* gear, and adding a cutting melting ring between the cone head and the pressure sleeve, when the cone crusher is running under load, the rotation of the distribution plate and the cone head can be used to automatically tighten, reducing the looseness of the moving cone. Wear.
4, Reduce the impact of bulk materials.
Materials with too large lumps should be prohibited from entering the cone crusher. If necessary, large lumps of materials can be blasted and then sent into the crushing cavity to reduce the impact and abrasion of the large materials on the moving cone.
5, Improve the force condition of the moving cone.
By installing a hydraulic device under the base of the cone crusher, the dead weight of the moving cone and the vertical component of the ore crushing are borne by the hydraulic cylinder to improve the force of the moving cone and make its operation stable and reliable, to a certain extent Reduce the damage of the moving cone.
6, Pay attention to the inspection during production. Once the cone crusher has an abnormality, all operators must s* the machine in time and conduct a * inspection. If the spherical bearing of the cone crusher is damaged, it needs to be repaired or replaced in time, and the clearance of the cone bushing of the cone crusher should be repaired or replaced in time. Make adjustments to ensure that there is enough space.
7, Reliable safety device.
Nowadays, hydraulic safety devices are generally used. When the equipment is overloaded or overloaded, the hydraulic safety devices can take effect immediately, reducing the damage to the moving cone caused by the overload of the cone crusher.
8, Prevent the imbalance of the moving cone.
The imbalance of the moving cone will cause serious accidents in the cone crusher, and even breakage, breakage of the main shaft, cracking of the cone bushing and other failures. Therefore, in the production, attention should be paid to prevent the unbalance of the moving cone. When the moving cone is found to be out of balance, the cause should be found out and eliminated in time to extend the service life of the moving cone and its equipment components.
9, Good lubrication.
Before the cone crusher starts to work, check the lubrication status of the moving cone and check whether there are impurities in the lubricating oil. During the operation of the moving cone, pay attention to the temperature of the lubricating oil and ensure that the oil circuit is clear. When the lubricating oil deteriorates, it is necessary to filter or replace the clean lubricating oil in time to ensure good lubrication of the moving cone.
Related News
- There is no need to rush to increase the production capacity of cone crushers. Here are the methods
- 9 ways to help you solve the problems of blocking, spilling and non-feeding of vibrating feeders
- How to use jaw crusher well in the first stage of material crushing?
- Important factors causing unsatisfactory operation of sand making machine
- How to view the amplitude of the vibrating screen?
- Characteristics and application of jaw crusher
Leave message
Product Center
- Cone Crusher Machine
- • PXH series gyratory crusher
- • Single cylinder cone crusher
- • Spring Cone Crusher
- • Compound Cone Crusher
- • PSG Series Compound Cone Crusher
- Stone Crushing Machine
- • Sand Making Machine
- • Jaw Crusher
- • Vertical Shaft Impact Crusher
- • Impact Crusher
- Screening Sand Washing
- • XS Sand washing machine
- • circular Vibrating Screen
- • ZSW Series Vibrating Feeder
- Mobile Crusher Plant
- • PC Series Mobile Cone Crusher Plants
- • PC Series Mobile Jaw Crusher Plants
- • PC Series Mobile Impact Crusher Plants
- • PC Series Mobile VSI Crushing Plants
Materials
- • River Stone Crushing Processing
- • Iron Ore Crushing Processing
- • Aggregate Crushing Processing
- • Granite Crushing Processing
- • Basalt Crushing Processing
- • Gold Ore Crushing Processing
Contact Us
Add:Room 609,Easttower,xiyuan international square,Jianshe Road,Zhengzhou City,Henan Province,China
Tel:+86-371-67660555
Whatsapp:+0086-13676922906
Email:sales@zxcrusher.com
Web:www.zxstonecrusher.com