What to pay attention to when installing sand making machine
Time:2020-09-15 Back to list
If you are looking for related products or have any other questions, please feel free to call our sales hotline or click the right button to ask for a quote online!
The sand making machine is the core equipment of the sand making production line. If it is installed incorrectly or not in place, the entire production line will not work normally, and it will also have a bad effect on the equipment. In order to avoid this accident, we need to understand The correct installation method of the sand machine.
Before installing the sand making machine equipment, * check according to the packing list to check whether the various parts are worn or not and whether they are complete during transportation. During installation, the sand making machine should be leveled so that its main shaft is perpendicular to the horizontal plane. Appropriate space should be left above and on both sides of the sand making machine for hoisting and maintenance. After the installation is completed, a * inspection should be carried out, for example, whether the lubricating oil pipe is firmly connected. When installing the sand making machine, pay attention to the following: Since the sand making machine vibrates *ly during work, the machine should be installed on a concrete foundation. In order to reduce vibration, noise and the impact on the foundations of nearby buildings and structures, the sand making machine and Hardwood pads, rubber bands or other shock-absorbing materials are used between the concrete foundations. The basic discharging trough should be laid with a layer of metal plate and have a sufficient inclination angle (it should be determined according to the fluidity of the material, not less than 50°), so as not to hinder the smooth discharge of the crushed product. The size of the discharge opening should be adjusted according to the required product granularity.
When adjusting, loosen the T-line bolts and tension springs. Use jacking bolts to open the adjusting seat, insert or remove the gasket of corresponding thickness, and then retract the jacking bolts, and the adjusting seat will be close to the ear seat of the frame under the weight of the movable jaw, while pressing the gasket group Get together. After that, adjust the spring preload to ensure that the thrust plate and the thrust plate pad are in close contact when the machine is working.
Before installing the sand making machine equipment, * check according to the packing list to check whether the various parts are worn or not and whether they are complete during transportation. During installation, the sand making machine should be leveled so that its main shaft is perpendicular to the horizontal plane. Appropriate space should be left above and on both sides of the sand making machine for hoisting and maintenance. After the installation is completed, a * inspection should be carried out, for example, whether the lubricating oil pipe is firmly connected. When installing the sand making machine, pay attention to the following: Since the sand making machine vibrates *ly during work, the machine should be installed on a concrete foundation. In order to reduce vibration, noise and the impact on the foundations of nearby buildings and structures, the sand making machine and Hardwood pads, rubber bands or other shock-absorbing materials are used between the concrete foundations. The basic discharging trough should be laid with a layer of metal plate and have a sufficient inclination angle (it should be determined according to the fluidity of the material, not less than 50°), so as not to hinder the smooth discharge of the crushed product. The size of the discharge opening should be adjusted according to the required product granularity.
When adjusting, loosen the T-line bolts and tension springs. Use jacking bolts to open the adjusting seat, insert or remove the gasket of corresponding thickness, and then retract the jacking bolts, and the adjusting seat will be close to the ear seat of the frame under the weight of the movable jaw, while pressing the gasket group Get together. After that, adjust the spring preload to ensure that the thrust plate and the thrust plate pad are in close contact when the machine is working.
Related News
- There is no need to rush to increase the production capacity of cone crushers. Here are the methods
- 9 ways to help you solve the problems of blocking, spilling and non-feeding of vibrating feeders
- How to use jaw crusher well in the first stage of material crushing?
- Important factors causing unsatisfactory operation of sand making machine
- How to view the amplitude of the vibrating screen?
- Characteristics and application of jaw crusher
Leave message
Product Center
- Cone Crusher Machine
- • PXH series gyratory crusher
- • Single cylinder cone crusher
- • Spring Cone Crusher
- • Compound Cone Crusher
- • PSG Series Compound Cone Crusher
- Stone Crushing Machine
- • Sand Making Machine
- • Jaw Crusher
- • Vertical Shaft Impact Crusher
- • Impact Crusher
- Screening Sand Washing
- • XS Sand washing machine
- • circular Vibrating Screen
- • ZSW Series Vibrating Feeder
- Mobile Crusher Plant
- • PC Series Mobile Cone Crusher Plants
- • PC Series Mobile Jaw Crusher Plants
- • PC Series Mobile Impact Crusher Plants
- • PC Series Mobile VSI Crushing Plants
Materials
- • River Stone Crushing Processing
- • Iron Ore Crushing Processing
- • Aggregate Crushing Processing
- • Granite Crushing Processing
- • Basalt Crushing Processing
- • Gold Ore Crushing Processing
Contact Us
Add:Room 609,Easttower,xiyuan international square,Jianshe Road,Zhengzhou City,Henan Province,China
Tel:+86-371-67660555
Whatsapp:+0086-13676922906
Email:sales@zxcrusher.com
Web:www.zxstonecrusher.com